| No. |
Num |
Size |
Position |
Price |
Production fee |
| SZ-H-DTD-02(A) |
1 pillar |
2.86m×4.11m |
Light box for the straight ladder in the waiting hall |
120000 yuan/pillar/month |
300 yuan/㎡ |
| SZ-H-DTD-01(ABCD) |
1 pillar |
See remarks |
Light box for the straight ladder in the waiting hall |
300000 yuan/pillar/month |
300 yuan/㎡ |
| No. |
SZ-H-DTD-02(A) |
| Num |
1 pillar |
| Size |
2.86m×4.11m |
| Position |
Light box for the straight ladder in the waiting hall |
| Price |
120000 yuan/pillar/month |
| Production fee |
300 yuan/㎡ |
| No. |
SZ-H-DTD-01(ABCD) |
| Num |
1 pillar |
| Size |
See remarks |
| Position |
Light box for the straight ladder in the waiting hall |
| Price |
300000 yuan/pillar/month |
| Production fee |
300 yuan/㎡ |
Notes*Specification: SZ-H-DTD-01 (A): 2.85 meters x 1.84 meters; SZ-H-DTD-01 (B): 3.24 meters x 1.84 meters; SZ-H-DTD-01 (C): 2.85 meters x 3.9 meters; SZ-H-DTD-01 (D): 3.25m x 1.84m.